How To Install Lp Lap Siding?

How To Install Lp Lap Siding?

What nails do you use for LP SmartSide?

Nailing Requirements Using a nail gun makes quick work of installing LP SmartSide products. You ‘ll want to use a minimum of. 113-inch shank diameter hot-dipped galvanized box-style nails with a minimum of 0.27-inch head diameter. The nails should be long enough to penetrate the structural framing by at least one inch.

Do you face nail LP SmartSide?

Siding should be installed with top ( blind ) nailing, with the nails placed a mini- mum of 3/8 in (9.5 mm) from either end. Siding may be face nailed as required.

Can you screw LP SmartSide?

Do not use electroplated fasteners. 38 Series and 76 Series panels must be installed on framing spaced no greater than 16 inch o.c. Do not force siding into place. Maintain the illustrated 1/8 inch space at the joint to allow for expansion while the panel equilibrates with the local environment.

Can you install LP SmartSide in the rain?

If such conditions exist, the building should be well ventilated to allow it to dry prior to the application of the siding. Siding must not be applied to green or crooked structural framing members. Do not apply siding over rain -soaked or buckled sheathing materials.

You might be interested:  Question: How To Replace Tongue And Groove Barn Siding?

How long does LP SmartSide last?

Frankly, while the LP SmartSide warranty lasts 20 years beyond Hardie’s, it is prorated, so it loses value every year, and most homeowners are ready for a siding change by that time anyway.

Can I use a framing nailer for LP SmartSide?

Using a nail gun makes quick work of installing LP SmartSide products. You will want to use a minimum of. 113-inch shank diameter, hot-dipped, galvanized box-style nail with a minimum of. 270-inch head diameter.

Do you need to prime LP SmartSide?

According to the terms of LP’s application instructions, all exposed edges of LP ® SmartSide ® siding and trim must be primed and painted with approved paint to protect the siding substrate. Therefore, do not prime the back side of the siding or trim.

How do you nail LP SmartSide?

Penetrate structural framing or wood structural panels and structural framing a minimum of 1-1/2 in. Nail from the center of the siding toward the ends, or from one end to the other end. NEVER nail from the ends of the siding toward the middle.

How do you calculate LP smart siding?

Add together the square footage you calculated for the sides of your home and the additional areas. Subtract the uncovered areas’ square footage from the total amount you calculated in step four. Divide this number by 100 to get the number of squares of siding you will need to order.

How often does LP SmartSide need to be painted?

LP ® SmartSide ® products should be painted as soon as possible after installation. They must be painted within 180-days of installation. Refer to the installation instructions for proper finishing of the siding and trim.

You might be interested:  FAQ: How Long Does T-111 Siding Last?

What is the cheapest siding for a shed?

The cost of siding a shed with board-and-batten depends on the shed dimensions, plus the widths of the planks used, and the grade of lumber – even 5/4” thick pressure treated deck boards ( cheaper than premium or select grade) or fence boards could be used. The cheapest would be recycled boards.


Leave a Reply

Your email address will not be published. Required fields are marked *